Ace C_TS413_2021 Certification with 90 Actual Questions [Q52-Q76]

Share

Ace C_TS413_2021 Certification with 90 Actual Questions

PASS SAP C_TS413_2021 EXAM WITH UPDATED DUMPS

NEW QUESTION # 52
The maintenance technician wants to document the finished work steps for a technical object in a notification. Which catalog-based option in the notification can be used?

  • A. A task in the notification item
  • B. A text in the subject long text screen
  • C. An entry in the object list
  • D. An activity in the notification header

Answer: D


NEW QUESTION # 53
You want to create a new functional location. Which configurationsteps are required? Note: There are 2 correct answers to this question.

  • A. Define the reference functional location.
  • B. Define the structure indicator.
  • C. Define the number range for the functional location category.
  • D. Define the functional location category.

Answer: B,D


NEW QUESTION # 54
Where can the maintenance planner perform a material availability check? Note: There are 2 correct answers to this question.

  • A. Via the Change Maintenance Order SAP Fiori app
  • B. Via the Manage Maintenance Order List SAP Fiori app
  • C. Via the multi-level order list (SAP GUI)
  • D. Within the SAP Fiori-based background job

Answer: C,D


NEW QUESTION # 55
Which steps are available for the maintenance technician when using the Report Malfunction tile? Note: There are 3 correct answersto this question.

  • A. Display the current location of the technical object.
  • B. Input estimated costs for repair malfunction.
  • C. Add a URL to provide further information.
  • D. Select and print the maintenance order shop papers.
  • E. View details of the technical object by navigating to the Asset Viewer.

Answer: A,C,E


NEW QUESTION # 56
Which of the following are components of cloud-based SAP Intelligent Asset Management? Note: There are 2 correct answers tothis question.

  • A. SAP Work Manager
  • B. SAP Asset Manager
  • C. Worker safety applications
  • D. SAP Predictive Maintenance and Service

Answer: B,D


NEW QUESTION # 57
You cancel the technical completion of a work order. What are theeffects? Note: There are 2 correct answers to this question.

  • A. Open purchase requisitions are recompiled
  • B. Referenced notifications are put In Process again.
  • C. Open purchase orders are recompiled.
  • D. Open reservations are recompiled.

Answer: A,D


NEW QUESTION # 58
You want to display additional document information within the document flow of a maintenance order. For which type of documentmust this be customized?

  • A. Purchase order
  • B. Invoice
  • C. Goods movement
  • D. Service entry sheet

Answer: C


NEW QUESTION # 59
Which statements about the structure indicator are correct? Note:There are 2 correct answers to this question.

  • A. It defines the allowed characters for a functional location.
  • B. It defines hierarchy levels of the functional location structure.
  • C. It defines which data is transferred to the lower levels of the hierarchy.
  • D. It can have a maximum length of 50 characters.

Answer: A,B


NEW QUESTION # 60
Which of the following are standard functionalities of SAP Asset Manager? Note: There are 3 correct answers to this question.

  • A. Technical objects
  • B. ESRI maps
  • C. Work orders and operations
  • D. Cost analytics
  • E. Breakdown analytics

Answer: A,C,E


NEW QUESTION # 61
You want to set up a scenario for regular maintenance. The first event should take place after 1 year; after that, it is a regular cycle of 6 months. Which parameter do you have to use to map this in thesystem?

  • A. Scheduling indicator
  • B. Shift factor
  • C. Maintenance package offset
  • D. Maintenance plan category

Answer: C


NEW QUESTION # 62
Which operations are possible when you cancel the technical completion of a maintenance order? Note: There are 2 correct answers to this question.

  • A. Book a goods receipt.
  • B. Change the estimated costs.
  • C. Change the priority.
  • D. Cancel status Released.

Answer: A,C


NEW QUESTION # 63
Which objects can you use in the safety measure list? Note: Thereare 2 correct answers to this question.

  • A. Documents
  • B. Work approval
  • C. Work clearance documents
  • D. Permits

Answer: A,D


NEW QUESTION # 64
What can you assign in a notification item? Note: There are 2correct answers to this question.

  • A. Only one object part
  • B. One or more object parts
  • C. One or more causes of damage
  • D. Only one cause of damage

Answer: B,C


NEW QUESTION # 65
Which operations can the responsible person perform after a maintenance order is technically completed? Note: There are 3correct answers to this question.

  • A. Lock or unlock the order.
  • B. Change the settlement rule.
  • C. Create an invoice receipt for delivered materials.
  • D. Change the planned costs.
  • E. Update the estimated costs

Answer: A,B,C


NEW QUESTION # 66
What is the goal of embedded analytics in SAP S/4HANA?

  • A. Combine the HANA database with SAP BW InfoProviders.
  • B. Integrate SAP BW into SAP S/4HANA.
  • C. Integrate SAP BusinessObjects Business Intelligence into SAP S/4HANA.
  • D. Combine transactional and analytical processing.

Answer: D


NEW QUESTION # 67
Which of the following statements about SAP Asset Manager aretrue? Note: There are 3 correct answers to this question.

  • A. SAP Asset Manager can run on smart watches.
  • B. SAP Asset Manager can be used offline.
  • C. SAP Asset Manager can be used offline.
  • D. SAP Asset Manager is available for Windows platform.
  • E. SAP Asset Manager is available for SAP S/4HANA and SAPERP.

Answer: B,C,E


NEW QUESTION # 68
What is the correct receiver object type for the settlement of arefurbishment order?

  • A. The material
  • B. The cost center
  • C. The fixed asset
  • D. The WBS element

Answer: A


NEW QUESTION # 69
Which of the following is a prerequisite for external refurbishment?

  • A. Define the order type for external refurbishment.
  • B. Select the material group for externally refurbished materials.
  • C. Create the purchasing info record for the external provider.
  • D. Activate the subcontracting indicator in an external activity.

Answer: D


NEW QUESTION # 70
You want to create a maintenance order with an external order operation with service items. Which of the following statements arecorrect? Note: There are 3 correct answers to this question.

  • A. The actual value entry can only be recorded via the service entrysheet.
  • B. The assignment of service master records to an order operation is optional.
  • C. The usage of a model service specification is mandatory.
  • D. The assignment of a control key with the service indicator set is mandatory.
  • E. The assignment of a control key with the service indicator set is mandatory.

Answer: A,D,E


NEW QUESTION # 71
You create two maintenance packages and only one package should be executed at a time. Which parameter determines this?

  • A. Package sequence
  • B. Subsequent buffer
  • C. Offset
  • D. Hierarchy

Answer: D


NEW QUESTION # 72
You have created a new equipment category, "linear", with the corresponding view profile. Which fields appear in the equipment linear data tab? Note: There are 3 correct answers to this question.

  • A. Unit of measure
  • B. Segment
  • C. Object network
  • D. Type of offset
  • E. Start marker

Answer: A,D,E


NEW QUESTION # 73
What can be determined using the offset within a maintenancestrategy?

  • A. The first due date of a maintenance package
  • B. The call date for the maintenance order
  • C. The cycle duration
  • D. The start date of the maintenance order

Answer: A


NEW QUESTION # 74
Which of the following statements are correct regarding a cross-plant planning scenario?

  • A. Multiple maintenance plants are assigned to a planning plant.
  • B. Multiple planning plants are assigned to a maintenance plant.
  • C. It combines maintenance plants in different controlling areas.
  • D. It is not supported in SAP S/4HANA.

Answer: B


NEW QUESTION # 75
You need to create a new functional location. Which actions can you perform with the SAP Fiori app Create Technical Object? Note:There are 3 correct answers to this question.

  • A. Assign a subordinate piece of equipment.
  • B. Change a reference location.
  • C. Edit classification data and characteristics.
  • D. Create a measuring point.
  • E. Assign documents.

Answer: C,D,E


NEW QUESTION # 76
......

C_TS413_2021 Questions PDF [2024] Use Valid New dump to Clear Exam: https://braindumps2go.dumpexam.com/C_TS413_2021-valid-torrent.html